Shipping policy

a) Time for delivery dates from the Seller’s acceptance of the
Buyer’s order.


b) The Seller shall not be under liability to the Buyer in respect
of any delay in delivery howsoever arising or any damage in
respect of or loss caused by or resulting from any such delay.


c) The Buyer shall take delivery of the equipment within seven
days of notification by the Seller that the equipment is ready for
collection or delivery. Should the Buyer fail to collect or take
delivery of the equipment then notwithstanding that the
equipment is in the possession of the Seller delivery shall be
deemed to have occurred for the purposes of this contract seven
days after such notification and the Buyer shall be liable for
payment of the equipment.


d) Where it is agreed in writing that the Seller shall be liable to
the Buyer for delay in delivery the Buyer shall nonetheless have
no claim against the Seller for delay in delivery of, or failure to
deliver, the equipment as a result of strikes labour disputes or
other industrial action emergency conditions fire flood accident
or any other cause whatsoever beyond the Seller’s control but
affecting the Seller or any of its subcontractors, whether or not
of a similar nature to any of the foregoing; nor shall the Buyer
have any claim against the Seller for failure to deliver the
equipment within the time specified if the Buyer is in breach of
any of the terms hereof or in any way delays the work.